Maps for the Weather Forecasting Project for Spring 2019
Click on the thumbnails below to open larger images in another window or tab.
The forecasts were initialized (started) at 00Z on Monday, January 21.
All of the maps required for the project are available in the table below. The GFS model
forecasts and ECMWF model forecast maps (middle 2 columns in table) are used in part 2 of the
project. The verification maps (last column of table) are used in part 3 of the project.
Table of 500 mb maps
Used in the Weather Forecasting Project