Maps for the Weather Forecasting Project for Fall 2019
Click on the thumbnails below to open larger images in another window or tab.
The forecasts are all valid for 00Z on Wednesday, November 13. The ECMWF model forecasts and the GFS model
forecasts (all maps except the last row) are used in part 2 of the project report.
The verification maps (last row of the table) are used in part 3 of the project.
The difference in each row is the length of the forecast time
between the model initialization time and the valid time for the forecast. The last
row contains the actual (or true) 500 mb height pattern for 00Z on Wednesday, November 13,
so it is not actually a forecast, but the 500 mb height pattern based on measurements.
A perfect forecast in any of the rows with forecast maps would exactly match the map
in the last row, which is sometimes called the forecast verification map.
Table of 500 mb maps
Used in the Weather Forecasting Project
Forecast Period
ECMWF Model Forecast Map
GFS Model Forecast Map
9-day forecast Initiated at 00Z Monday, November 4 Valid 00Z Wednesday, November 13
7-day forecast Initiated at 00Z Wednesday, November 6 Valid 00Z Wednesday, November 13
5-day forecast Initiated at 00Z Friday, November 8 Valid 00Z Wednesday, November 13
3-day forecast Initiated at 00Z Sunday, November 10 Valid 00Z Wednesday, November 13
0-day forecast Initialization for 00Z Wednesday, November 13 These are the Verification maps for the forecasts above
The two maps in this row should be nearly identical.